Burke, VA Development Tracker: Roads, VRE and Park Projects
#1 Selling Realtor in Northern Virginia by Units Sold Since 2020
Fairfax County Parkway Widening, Braddock Road, Burke Road Realignment, Rolling Road VRE Parking and Royal Lake Trails
Contact Us for Your Free Consultation Today

Sell Faster & For More Money With Nikki
$17.88 More Per SQFT & 45% Faster Vs. Reston Market Average (Nikki’s Reston Listings)*
Quick Answer: What Is Being Built Around Burke?
Status as of October 17, 2026. We update this page as agencies post new dates.
Quick answer: the biggest projects in and around Burke right now are road projects. VDOT is widening the Fairfax County Parkway to six lanes from Route 123 to Route 29 through mid-2027, Fairfax County is rebuilding a flood-prone stretch of Burke Road through September 2027, and the county is adding 38 parking spaces at the Rolling Road VRE station through March 2027. VDOT’s Braddock Road project is still in environmental review, with Phase 1 construction planned for fall 2030.
Back to the Burke, VA guide. Questions about how a project affects a specific home? Contact Nikki, call 703-596-5065 or text Nikki.
Named #1 Selling Realtor in Northern Virginia by Units Sold Since 2020
The best way to navigate Burke’s real estate market is with a knowledgeable realtor who listens, advocates, and works tirelessly for your goals. Nikki Lagouros offers a blend of proven expertise, honest guidance, and commitment to helping clients feel supported throughout every step.
#1 Selling Realtor in Northern Virginia by Units Sold Since 2020
Nikki is the #1 selling realtor in Northern Virginia by units sold since 2020, based on RealTrends’ Virginia sales rankings and her team’s transaction records. See Rankings & Data.
Above-Average
Market Results
Searching online for the “best realtor to sell my home”? Nikki’s Reston listings sell 45% faster and for $17.88 more per square foot than the Reston market average. Maximize your property value with Nikki managing your sale.
Trusted Local
Insights
A Northern Virginia resident since 2006, Nikki’s insights combine real estate market analysis and local expertise. Whether you need house-hunting help for a single-family home or a city condo, she’ll find the perfect fit for your lifestyle.
Personal, Family-First
Approach
As a wife, mom, and military spouse, Nikki understands the personal side of real estate. Whether you’re relocating for military postings or want to sell quickly, she offers thoughtful guidance.
Your Real Estate
Advocate
Nikki is by your side every step of the home-buying or selling process. With honest guidance and strong negotiation skills, she ensures your needs are prioritized, offering advice she would give her own family.
Burke Projects at a Glance
| Project | Status | What it changes | Timing | Official page |
|---|---|---|---|---|
| Fairfax County Parkway widening south | Under construction | About two miles widened from four lanes to six between Route 123 and Nomes Court/Ladues End Lane; a third northbound lane on Route 123 from Chapel Road; a 10-foot shared-use path between Route 123 and Burke Centre Parkway; a grade-separated bike and pedestrian crossing just north of Burke Centre Parkway; a free-flow right-turn lane from westbound Burke Centre Parkway | Began April 2025; third Route 123 lane opened August 2026; final completion mid-2027; estimated cost $126 million | VDOT |
| Fairfax County Parkway widening north | Under construction | About four miles widened from four lanes to six between Nomes Court/Ladues End Lane and Route 29, including wider bridges over Braddock Road and Route 29 | Began June 2024; final completion mid-2027 | VDOT |
| Fairfax County Parkway and Popes Head Road interchange | Finishing | A new interchange with roundabouts and two bridges over the Parkway | Began December 2023; partial opening June 2026; final completion late fall 2026 | VDOT |
| Burke Road realignment | Under construction | About 2,200 feet of Burke Road from Parakeet Drive to Peregrine Drive realigned and raised to reduce flooding, with a new drainage pipe and pedestrian and bicycle connections; $8.5 million budget | Began March 2026; completion scheduled for September 2027 | Fairfax County DOT |
| Rolling Road VRE station parking lot expansion | Under construction | 38 new parking spaces, ADA sidewalk replacement and an underground stormwater detention structure at the Burke Road lot | Began Aug. 21, 2026; substantial completion late March 2027 | Fairfax County DOT |
| Braddock Road multimodal improvements | In design and review | About three miles of Braddock Road with intersection enhancements, including at Rolling Road and Burke Lake Road, and new and upgraded paths | Section 4(f) comments due Oct. 19, 2026; Phase 1 (Southampton to Ravensworth) right-of-way fall 2027 and construction fall 2030; Phase 2 timing depends on funding | VDOT |
| Royal Lake trail improvements | Completed | A replaced bridge over Rabbit Branch, a new stream valley trail to Commonwealth Boulevard, repaved and newly paved trail links and a shade structure at Lakeside Park | Completed fall 2026; celebration Friday, Nov. 6, 2026, 4 to 5:15 p.m. | Park Authority |
| Burke Centre Oaks pool rebuild | Under construction | Reconstruction of the Conservancy’s Oaks pool, part of its capital reserve plan | Building permits received from Fairfax County; concrete shell expected by the end of December 2026; reopening date not published | Burke Centre Conservancy |
| Burke Lake Golf Center course work | Planned | Rolling one-hole work zones on the par 3 course | Oct. 19 to Nov. 16, 2026, Monday through Saturday | Park Authority news |
What It Means for Buyers and Owners
- Expect work zones until mid-2027: VDOT has a 45 mph work zone on the Parkway between I-66 and Route 123 and long-term lane shifts between Burke Centre Parkway and Route 123.
- Burke Road detours: if you commute from Rolling Road station or along Burke Road, check the county project page for lane and detour notices.
- Braddock Road is years out: homes along Braddock Road may see right-of-way work starting in fall 2027; ask whether VDOT has contacted the owner of any home you are considering.
- VRE parking: the Rolling Road lot is a construction zone until spring 2027; Burke Centre station’s garage is the larger option.
More: commuting from Burke, Burke neighborhoods compared and the events calendar. Nearby: the Fairfax development tracker. See all areas served, Rankings & Data and contact Nikki.
Burke Development FAQ
When will the Fairfax County Parkway widening near Burke be finished?
VDOT lists final completion in mid-2027 for both the south section, Route 123 to Nomes Court, and the north section, Nomes Court to Route 29.
Is Braddock Road being widened?
VDOT’s Braddock Road multimodal project focuses on intersection improvements and new paths. Phase 1 construction, from Southampton Drive to Ravensworth Road, is planned to begin in fall 2030.
What is happening on Burke Road?
Fairfax County is realigning and raising about 2,200 feet of Burke Road from Parakeet Drive to Peregrine Drive to reduce flooding. Construction began in March 2026 and is scheduled to finish in September 2027.
Get in Touch With Your Burke Real Estate Expert Today
Nikki Lagouros is your go-to real estate partner for buying or selling in Burke, VA. Schedule a consultation and start your journey toward a successful real estate experience.
Sources
Sources checked October 17, 2026.
- VDOT: Fairfax County Parkway widening south (updated Oct. 13, 2026); widening north (updated Sept. 2, 2026); Popes Head Road interchange (updated Oct. 15, 2026); Braddock Road multimodal improvements
- Fairfax County DOT: Burke Road Realignment Project; Rolling Road VRE Station Parking Lot Expansion (updated Aug. 19, 2026)
- Fairfax County Park Authority: Royal Lake’s New Trails (Oct. 5, 2026); Park news
- Burke Centre Conservancy: The Conservator, October 2026
- Hero photo: Burke Centre VRE parking garage, photo by Idawriter, CC BY-SA 3.0 via Wikimedia Commons.